Focus on customer made high quality power lithium battery and test equiment to very application.
High Performance Management
Flexible installation
· Ultra - simple Layout: The AC and DC components are vertically arranged, eliminating the floor space occupied by the PCS (Power Conversion System) and water - cooling units. The volume of a single product is reduced by 25%.
· Dynamic Capacity Expansion: The products can be placed back - to - back or side - by - side, maximizing space utilization. Flexible capacity expansion is not restricted by the site.
· Extra - long Lifespan: Balancing technology improves battery consistency, extends the system lifespan, and ensures high economic efficiency of the system.
· Efficient Heat Dissipation: Using the PACK liquid - cooled heat dissipation mode, the temperature difference of battery cells is ≤ 2.8℃. Auxiliary energy consumption is reduced by 30%, saving operating costs.
· Cluster - level Management: One management per cluster, with current - sharing control among clusters. There is no "barrel effect". The depth of discharge can be adjusted, and the charge - discharge capacity over the entire life cycle is increased by 8%.
· One - click Power - on: Performance and function debugging are completed before leaving the factory. There is no need for on - site debugging. The equipment can be connected to the grid as soon as it arrives at the station.
Intelligent Operation and Control
· Remote Management: Enable online intelligent monitoring to reduce the frequency of manual inspections.
· Dynamic Adjustment: Conduct high - precision State of Charge (SOC) assessment and dynamically adjust energy efficiency management strategies according to the load.
· Multi - mode Switching: Built - in multiple working modes such as peak - shaving and valley - filling, demand response, backup power supply, and command response.
more specification
BESS SOLUTION
About LISINER
LINISER which is son company of Gelly Auto Group, serves as a BESS manufacturer of home lighting since 2012. The company takes up an area of 36,000, We enroll 1200 workers, consisting of the design team, R&D team, production team, and after-sales team.
A total of 59 designers are responsible for the structure and appearance of the products. We have 63 staff to monitor the finished products at different processing phrases. With all the staff full of responsibility, we strive for being the BESS specialist with a commitment to quality.
FAQ